Let's Talk
+44 (0) 121 511 0400
ipu@ipu.co.uk
IPU Group
Log in
StoreQuote
ContactsContact us
  • Home Page
  • Explore IPU
  • Your Industry
    • Marine Industry
    • Oil & Gas Industry
    • Mining
    • Healthcare
    • Data Centres & IT Services
    • Power Generation
  • IPU Academy
  • Fuel Management Services
    • Case Studies
    • IPU Fuel Conditioning Programmes
    • Diesel Testing – DieselCheck Service & Kits
    • Fuel Polishing Systems – Diesel Defence
    • Diesel Defence Servicing
    • Cloud Based Fuel Monitoring
    • Diesel Defender Fuel Additive
    • Supporting Fuel Conditioning Products
    • What is Diesel Contamination?
    • Fuel Conditioning Contacts
  • Engine Starting
    • Case Studies
    • Hydraulic Engine Starting
    • Spring Starters – SureStart
    • Air Starters
    • Nitrogen Starting Systems
    • Reman Air Starter Motors
    • ATEX Starting
    • Inertia Starter Motors
    • Pre-engaged Starters
    • Servicing
    • Engine Starting Contacts
  • Case Studies
  • About IPU
    • About Us
    • Our capabilities
    • Our Distributors
    • IPU’s COVID-19 Response
    • Meet the Management Team
    • IPU Finance Options
    • Contact Us
    • Our History
    • Quality & Environmental
    • Modern Slavery Policy
    • Careers
    • News
    • Compliments & Complaints
  • Contact Us
  • Downloads
  • News

Home » Case Studies » Engine Starting » Engine Starting - Air

Engine Starting - Air

Torpille

IPU were recently contracted to supply the emergency starting system on the fire pump replacement for the mature Torpille Field offshore Gabon. The starting system was designed to as an emergency back up on the CAT C15 engine. As the platform has a constant air supply, the recharging of the start accumulator is achieved with both a manual hand pump and also a pneumatically driven hydraulic pump. Boosting the air supply by a ratio of 60:1 the air driven pump uses the platform air supply to recharge the accumulators to 207bar. On reaching the system working pressure, the air driven pump stalls, only re-starting when pressure in the accumulator falls on start up of the engine, thus making an…

Read more…

Pearl Air Starting GTL

IPU have supplied six complete air start systems for the Pearl GTL project in Qatar.

Read more…
Air Starting System

Sakhalin Island Air Start 2

Two CAT 3608 emergency generator sets located on a jetty required separate compressed air secondary starting systems.

Read more…

Sakhalin Island Air Start 1

Environmental operating conditions with extreme temperature ranges of –36°C to +35°C were a major consideration in the selection of appropriate materials and components.

Read more…
  • This field is for validation purposes and should be left unchanged.
IPU Group

Registered in England & Wales: 12167631

Industrial Power Units Ltd
Cygnus Way
West Bromwich
West Midlands