Let's Talk
+44 (0) 121 511 0400
ipu@ipu.co.uk
IPU Group
Log in
StoreQuote
ContactsContact us
  • Home Page
  • Explore IPU
  • Your Industry
    • Marine Industry
    • Oil & Gas Industry
    • Mining
    • Healthcare
    • Data Centres & IT Services
    • Power Generation
  • IPU Academy
  • Fuel Management Services
    • Case Studies
    • IPU Fuel Conditioning Programmes
    • Diesel Testing – DieselCheck Service & Kits
    • Fuel Polishing Systems – Diesel Defence
    • Diesel Defence Servicing
    • Cloud Based Fuel Monitoring
    • Diesel Defender Fuel Additive
    • Supporting Fuel Conditioning Products
    • What is Diesel Contamination?
    • Fuel Conditioning Contacts
  • Engine Starting
    • Case Studies
    • Hydraulic Engine Starting
    • Spring Starters – SureStart
    • Air Starters
    • Nitrogen Starting Systems
    • Reman Air Starter Motors
    • ATEX Starting
    • Inertia Starter Motors
    • Pre-engaged Starters
    • Servicing
    • Engine Starting Contacts
  • Case Studies
  • About IPU
    • About Us
    • Our capabilities
    • Our Distributors
    • IPU’s COVID-19 Response
    • Meet the Management Team
    • IPU Finance Options
    • Contact Us
    • Our History
    • Quality & Environmental
    • Modern Slavery Policy
    • Careers
    • News
    • Compliments & Complaints
  • Contact Us
  • Downloads
  • News

Home » Case Studies » Engine Starting » Engine Starting - Hydraulic » BP Chirag Project

BP Chirag Project

Application: Azeri Offshore Platform
Location: Caspian Sea
Engine: CAT 3516HD

Hydraulic Start Packages – BP Chirag

British Petroleum (BP) needed a Hydraulic Starting System for the Chirag Oil Project (COP), this is an offshore development located in the Azerbaijan sector of the Caspian Sea, approximately 120 km southeast of Baku.

IPU were awarded all starting system designs and manufacturing for the project after lengthy design consultation periods with BP, KBR and the engine packager. The four start systems supplied were to provide starting capability to two fire pumps, one compressor and the emergency generator set shown in the photograph opposite.

The installation of the hydraulic start system was unusual, as the space available was very limited. The design had to fit in a narrow passage between the container wall and the engine, whilst still allowing for general operations. IPU successfully installed the hydraulic accumulators below floor level and so the start system became an integral part of the container floor.

The company chose IPU because:

  • The company required experts in Hydraulic Start Systems
  • IPU are fully equipped to deal with changing circumstances and environments
  • IPU understood the importance of working to specific BP approved standards
  • Could provide the support and after care needed for such a complex application build, alongside all necessary supporting documentation, certification and approvals needed for offshore environments

For more information contact a member of our Starting Sales Team on +44 (0) 121 511 0400

« Previous Case Study
Next Case Study »
« Back to all News

Downloads(no ID req'd)

  • IPU Case Study – BP Chirag
  • This field is for validation purposes and should be left unchanged.
IPU Group

Registered in England & Wales: 12167631

Industrial Power Units Ltd
Cygnus Way
West Bromwich
West Midlands
B70 0XB, UK

Contact us
+44 (0) 121 511 0400
+44 (0) 121 511 0401
ipu@ipu.co.uk
Links
  • Product Registration
  • Product Manuals
  • Terms & Conditions of Sales
  • Privacy & Cookies